Relining of broken 150mm sewer line directly under the factories computer systems in Toby Estate, City-Road, Chippendale
Northern Beaches Hospital – Relining of 50mm waste pipes under 2 bathroom floors
Relining of 50mm waste pipes under 2 bathroom floors in Northern Beaches Hospital
Relining of a damaged 100mm sewer pipe at Wollongong Hospital
Relining of a damaged 450mm storm-water pipe on the Gore Hill Freeway – Naremburn NSW
Gore Hill Freeway, Naremburn, NSW – Relining of a damaged 450mm storm-water pipe underway
Surveying a 225mm Sewer Pipe at Collaray Plateau so we could provide a quote to do a pipe relining job
Surveying a 225mm Sewer Pipe at Collaray Plateau in progress so we could provide a quote to do a pipe relining job
Pipe Relining Work at a Substation in Sydney, NSW
Pipe relining a stormwater drain without the need to dig
Epoxy Pipe Relining – You can see how the epoxy would fill in pipe crack and joints
Getting ready to reline a 100mm sewer pipe at Avalon, NSW
At Infinity Lining we are experienced at using new and complex lining machinery
Junction Lining Pre-Empts Future Repairs to Sewer and Storm Water Pipes. Junction Lining finishes the Relining process of rehabilitating the house connection branch to the main sewer pipe. It seals the point where the house connection meets the sewer retic.
Relining of a 100mm pipe at a water board pumping station in Manly, NSW
Brawoliner is a concept that provides long-lasting protection and rapid assistance in the area of sewerage rehabilitation systems.
Preparing a 600mm lining packer for a lining job at Mosman, NSW
Preparing a patch liner for a Patch lining job at Mosman
100mm Electrical Conduit relined at Belrose
Relining of Asbestos electrical conduit at substation in Sydney
A reclined epoxy 100mm sewer pipe at a job in Mona Vale
Reclined epoxy 100mm sewer pipe at a job in Bellevue Hill, NSW
Preparing a liner for an installation at a unit block in Manly Vale, NSW
Disadvantages of a conventional sewer repair at a job in Bayview
Relining equipment demonstration by suppliers at Cromer, a suburb in northern Sydney, NSW
Relining of a 150mm sewer pipe in a residential home in Seaforth a suburb in northern Sydney
Relining a 225mm stormwater pipe with a sluice at an apartment block in Waverton a suburb on the lower North Shore of Sydney
Preparing a liner for a 225mm stormwater job at an apartment block in Waverton a suburb on the lower North Shore of Sydney
Relining of 200mm pool pipes at Leichhardt Aquatic Centre in Lilyfield NSW
Relining of a 450mm stormwater pipe at Dee Why Grand Shopping Centre in Dee Why NSW
Relining of a 300m stormwater pipe at service station in Hornsby
Relining of a 225m stormwater pipe at Royal Botanical Gardens, Sydney without having to use the conventional method to dig to replace the pipe lines
Preparation going on to reline a 300m stormwater pipe at an ADF Site at Randwick, NSW
Relining of a 300m stormwater pipe at an ADF Site at Randwick, NSW
Relining of a 100mm sewer pipe at a home in St. Ives
Relining of a 100mm stormwater pipe at a post office in Rose Bay
Relining of a 100mm stormwater pipe that goes under the building of an apartment block at Wylde Street, Potts Point
Relining 50mm urinal pipework at office buildings in St.Leonards
Infinity Lining Relining work of a 225mm stormwater pipe at Kmart Store in Sydney
Pipe Lining Job in a residential home in Bondi Beach, NSW
Dee Why Grand Shopping Centre – relining of a 450mm stormwater pipe
At the National Centre of indigenous excellence in Redfern Infinity Lining reelined 150mm pool pipes
Relined 150mm pool pipes at the National Centre of indigenous excellence in Redfern
Preparing to reline the pipework of the Heritage Listed Coach House in Randwick
Relining at an electrical substation in Sydney
Relining of a 100mm stormwater pipe on a rooftop in Artarmon NSW
Relining of a 225mm stormwater pipe at the Royal Botanical Gardens Sydney
Relined Boundary Trap Shaft at a home in Newport, NSW
Pipe relining equipment demonstration by suppliers in Cramer
Relining of 150mm sewer pipework at McDonalds Restaurant in Sydney CBD completed over the course of 3 nights